Amico Properties’ 42 Mill Street Condos – Phase 1 is a new condo development at 42 Mill Street in Halton Hills. The project was finished in 2021. There are 78 units in Phase 1 of 42 Mill Street Condos.
42 Mill Street Condos – Phase 1 Details
Community Name: 42 Mill Street
Building Type: Condo
Ownership: Condominium
Selling Status: Sold Out
Sales Started: Nov 2017
Construction Status: Complete
Construction Started: Feb 2019
Completed In: Feb 2021
Builder(s): Amico Properties
Building Type: Condo
Ownership: Condominium
Selling Status: Sold Out
Sales Started: Nov 2017
Construction Status: Complete
Construction Started: Feb 2019
Completed In: Feb 2021
Builder(s): Amico Properties
42 Mill Street Condos – Phase 1 Summary
Exceptional external elevations with brick, stone, Hardie Board siding, aluminium, and other one-of-a-kind, high-end materials. To provide a really cohesive 4-story cityscape fronting Mill Street, all elevations are subject to tight architectural control. A round-about canopy entrance greets residents and their guests to a private driveway.
fixtures for sconces.
fixtures for sconces.
ALL residences include a custom-built, European-style kitchen with built-in cabinetry, a refrigerator, and a dishwasher. Upgraded kitchen cabinets with higher uppers, including a deep upper cabinet above the refrigerator and microwave. 12” high quartz counters with a square built-up edge. Over the stove, a new variable-speed ducted hood fan was installed. Easy-to-clean double stainless steel undermount sink with enhanced.
FEATURES OF ENVIRONMENTAL GREEN
• Charging facilities for electric vehicles
• Hydro metering is done separately.
• Light bulbs that save energy
• Installing a water softener
• Toilets with two flushes to save water
• Aerators on faucets and shower heads to save water
• Charging facilities for electric vehicles
• Hydro metering is done separately.
• Light bulbs that save energy
• Installing a water softener
• Toilets with two flushes to save water
• Aerators on faucets and shower heads to save water
Source: Buzz Buzz Homes
Property Id: 21983
Property Builders: Amico Properties
Property Name: 42 Mill Street Condos – Phase 1
$ 1.00
per month
- Principal and Interest
- Property Tax
- HOA fee
$ 0.00
Sun
04
Oct
Mon
05
Oct
Tue
06
Oct
Wed
07
Oct
Thu
08
Oct
Fri
09
Oct
Sat
10
Oct
Sun
11
Oct
Mon
12
Oct
Tue
13
Oct
Map
| Builder | Amico Properties |
| Main Intersection | Mill St/ Guelph St |
| Property Type | Condominium |
| Number of Units | 78 |
Similar Listings
2
Featured
Semi-Detached
Sold Out
Woodlands
Sierra Lane (off Grey Road 19) The Blue Mountains, ON
Starting from $500's
SIERRA COMMUNITIES
2
Featured
Townhomes
Sold Out
2
Featured
Bungalows
Sold Out
Tanglewood
Sierra Trail & Cranberry Trail East Collingwood, ON
Starting from $300's
SIERRA COMMUNITIES
2
Featured
Semi-Detached
Sold Out

